Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0775 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,966 | $20,488 | Not Implemented |
MA0775 # 06 Y:2017 | 06 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $708 | $412 | Not Implemented |
MA0776 # 01 Y:2017 | 01 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $35,581 | $238,058 | Not Implemented |
MA0776 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,365 | $15,725 | Implemented |
MA0776 # 03 Y:2017 | 03 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $973 | $301 | Implemented |
SU0445 # 01 Y:2017 | 01 | 2017 | DISCONNECT BALLASTS | $122 | $0 | Implemented |
SU0445 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,399 | $3,850 | Implemented |
SU0445 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $368 | $750 | Implemented |
SU0445 # 04 Y:2017 | 04 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $62 | $237 | Implemented |
SU0445 # 05 Y:2017 | 05 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $430 | $1,799 | Implemented |
TR0002 # 01 Y:2017 | 01 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $30,725 | $22,000 | Implemented |
TR0002 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $500 | Implemented |
TR0002 # 03 Y:2017 | 03 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,895 | $10,000 | Not Implemented |
TR0002 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $187 | $55 | Implemented |
TR0002 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,329 | $60 | Implemented |
TR0002 # 06 Y:2017 | 06 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,204 | $0 | Implemented |
SF0504 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,032 | $100 | Implemented |
SF0504 # 02 Y:2017 | 02 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,259 | $2,279 | Not Implemented |
SF0504 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $1,736 | $7,335 | Implemented |
SF0504 # 04 Y:2017 | 04 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,348 | $373,319 | Not Implemented |
IC0194 # 01 Y:2017 | 01 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $124,626 | $220,275 | Implemented |
IC0194 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $87,344 | $137,763 | Implemented |
IC0194 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,467 | $8,000 | Not Implemented |
IC0194 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,741 | $8,162 | Not Implemented |
MI0313 # 01 Y:2017 | 01 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,711 | $620 | Not Implemented |