IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3019 # 08 Y:2012 08 2012 INSULATE BARE EQUIPMENT $2,412 $1,248 Implemented
UA3019 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $99,802 $195,000 Not Implemented
UA3019 # 10 Y:2012 10 2012 IMPROVE COMBUSTION CONTROL CAPABILITY $28,009 $90,000 Not Implemented
UA3019 # 11 Y:2012 11 2012 REPAIR AND ELIMINATE STEAM LEAKS $4,250 $4,060 Not Implemented
UA3019 # 12 Y:2012 12 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,737 $800 Not Implemented
NC0458 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $453 $100 Implemented
NC0458 # 02 Y:2012 02 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,650 $1,040 Not Implemented
NC0458 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,851 $26,563 Implemented
NC0458 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $3,659 $441 Implemented
NC0458 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $169 $250 Implemented
NC0458 # 06 Y:2012 06 2012 IMPROVE SPACE COMFORT CONDITIONING $83,263 $35,225 Not Implemented
NC0458 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $196,000 $25,000 Not Implemented
NC0458 # 08 Y:2012 08 2012 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $211,680 $48,800 Implemented
OR0584 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,320 $0 Not Implemented
OR0584 # 02 Y:2012 02 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $26,558 $19,925 Not Implemented
OR0584 # 03 Y:2012 03 2012 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $16,839 $29,000 Not Implemented
OR0584 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,631 $27,000 Not Implemented
OR0584 # 05 Y:2012 05 2012 MINIMIZE WATER USAGE $4,574 $7,000 Not Implemented
OR0584 # 06 Y:2012 06 2012 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $7,796 $19,701 Not Implemented
OR0584 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,152 $251,677 Not Implemented
LE0340 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,181 $8,250 Not Implemented
LE0340 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,208 $54,225 Not Implemented
LE0340 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $953 $1,000 Not Implemented
LE0340 # 04 Y:2012 04 2012 INSTALL TIMERS AND/OR THERMOSTATS $26,676 $0 Not Implemented
LE0340 # 05 Y:2012 05 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $5,033 $5,527 Not Implemented