IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0295 # 04 Y:2016 04 2016 USE PHOTOCELL CONTROLS $11,307 $10,380 Not Implemented
MI0295 # 05 Y:2016 05 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,874 $40 Not Implemented
MI0295 # 06 Y:2016 06 2016 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $7,334 $4,411 Not Implemented
MI0295 # 07 Y:2016 07 2016 PAY UTILITY BILLS ON TIME $4,723 $0 Not Implemented
MI0295 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,957 $1,660 Not Implemented
MI0295 # 09 Y:2016 09 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,084 $320 Not Implemented
MI0295 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $1,284 $683 Not Implemented
MI0295 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $448 $640 Not Implemented
MI0294 # 01 Y:2016 01 2016 LOWER CEILING TO REDUCE CONDITIONED SPACE $48,743 $88,928 Not Implemented
MI0294 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,734 $29,594 Implemented
MI0294 # 03 Y:2016 03 2016 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,706 $5,161 Not Implemented
MI0294 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,388 $1,660 Implemented
MI0294 # 05 Y:2016 05 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,921 $1,441 Implemented
MI0294 # 06 Y:2016 06 2016 CONDENSE OPERATION INTO ONE BUILDING $5,648 $1,360 Not Implemented
MI0294 # 07 Y:2016 07 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,081 $4,200 Implemented
MI0294 # 08 Y:2016 08 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,830 $40 Implemented
MI0294 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,218 $12,637 Not Implemented
MI0294 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,176 $7,505 Not Implemented
MI0294 # 11 Y:2016 11 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,797 $40 Implemented
MI0294 # 12 Y:2016 12 2016 INSTALL OCCUPANCY SENSORS $1,209 $1,237 Not Implemented
MI0294 # 13 Y:2016 13 2016 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,012 $800 Not Implemented
MI0294 # 14 Y:2016 14 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $502 $1,624 Not Implemented
MI0294 # 15 Y:2016 15 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $502 $760 Not Implemented
MI0294 # 16 Y:2016 16 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $342 $375 Implemented
MI0294 # 17 Y:2016 17 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $124 $340 Not Implemented