Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0712 # 01 Y:2016 | 01 | 2016 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $48,140 | $2,710 | Not Implemented |
AM0712 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,510 | $46,840 | Not Implemented |
AM0712 # 03 Y:2016 | 03 | 2016 | OPTIMIZE PLANT POWER FACTOR | $11,700 | $26,740 | Not Implemented |
AM0712 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,710 | $30 | Not Implemented |
AM0712 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $450 | $200 | Not Implemented |
AM0712 # 06 Y:2016 | 06 | 2016 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $400 | $0 | Not Implemented |
AM0712 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $350 | $150 | Not Implemented |
AM0712 # 08 Y:2016 | 08 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $110 | $280 | Not Implemented |
AM0711 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $62,500 | $108,300 | Not Implemented |
AM0711 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,350 | $57,195 | Implemented |
AM0711 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,630 | $9,030 | Implemented |
AM0711 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $18,515 | $60,200 | Not Implemented |
AM0711 # 05 Y:2016 | 05 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $17,450 | $26 | Not Implemented |
AM0711 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,000 | $13 | Not Implemented |
AM0711 # 07 Y:2016 | 07 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,344 | $2,620 | Not Implemented |
AM0711 # 08 Y:2016 | 08 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,880 | $0 | Implemented |
AM0711 # 09 Y:2016 | 09 | 2016 | USE SYNTHETIC LUBRICANT | $1,072 | $0 | Not Implemented |
AM0711 # 10 Y:2016 | 10 | 2016 | PAY BILLS ON TIME TO AVOID LATE FEES | $471 | $0 | Not Implemented |
OK0943 # 01 Y:2016 | 01 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $40,741 | $19,000 | Implemented |
OK0943 # 02 Y:2016 | 02 | 2016 | PAY UTILITY BILLS ON TIME | $21,826 | $0 | Implemented |
OK0943 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,211 | $0 | Implemented |
OK0943 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,792 | $250 | Not Implemented |
OK0943 # 05 Y:2016 | 05 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,584 | $1,350 | Not Implemented |
OK0943 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $645 | $1,405 | Implemented |
OK0943 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,445 | $11,700 | Implemented |