Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0328 # 07 Y:2003 | 07 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $3,900 | $4,000 | Implemented |
MI0063 # 01 Y:2003 | 01 | 2003 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $125,255 | $28,140 | Implemented |
MI0063 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $417 | $189 | Not Implemented |
MI0063 # 03 Y:2003 | 03 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $327 | $75 | Not Implemented |
MI0063 # 04 Y:2003 | 04 | 2003 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $15,652 | $4,000 | Not Implemented |
MI0063 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,095 | $169 | Implemented |
MI0063 # 06 Y:2003 | 06 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,893 | $4,420 | Implemented |
MA0537 # 01 Y:2003 | 01 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $94,545 | $112,240 | Not Implemented |
MA0537 # 02 Y:2003 | 02 | 2003 | ADOPT IN-HOUSE MATERIAL GENERATION | $61,752 | $240,000 | Not Implemented |
MA0537 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,180 | $8,000 | Not Implemented |
MA0537 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,446 | $10,396 | Implemented |
MA0537 # 05 Y:2003 | 05 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,043 | $3,500 | Not Implemented |
MA0537 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $464 | $150 | Implemented |
MA0537 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $154 | $0 | Implemented |
UF0327 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,630 | $0 | Implemented |
UF0327 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,198 | $0 | Implemented |
UF0327 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $985 | $5,476 | Implemented |
UF0327 # 04 Y:2003 | 04 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,892 | $10,175 | Implemented |
UF0327 # 05 Y:2003 | 05 | 2003 | ADD AREA LIGHTING SWITCHES | $984 | $4,290 | Not Implemented |
UF0327 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,991 | $376 | Implemented |
UF0327 # 07 Y:2003 | 07 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $39,320 | $10,726 | Not Implemented |
UF0327 # 08 Y:2003 | 08 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $21,592 | $110,000 | Implemented |
UF0327 # 09 Y:2003 | 09 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $15,228 | $5,300 | Implemented |
UF0327 # 10 Y:2003 | 10 | 2003 | INSTALL SYSTEM TO COLLECT SCRAP | $7,800 | $780 | Implemented |
UF0327 # 11 Y:2003 | 11 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $26,498 | $49,051 | Not Implemented |