IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0407 # 02 Y:2008 02 2008 AIR CONDITION ONLY SPACE NECESSARY $4,807 $0 Not Implemented
SD0407 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,196 $13,699 Implemented
SD0407 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,008 $7,140 Implemented
SD0407 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,341 $1,374 Implemented
SD0407 # 06 Y:2008 06 2008 INSTALL SKYLIGHTS $990 $2,940 Not Implemented
LE0273 # 01 Y:2008 01 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $40,528 $972,000 Not Implemented
LE0273 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,519 $1,440 Implemented
LE0273 # 03 Y:2008 03 2008 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $11,082 $1,560 Not Implemented
LE0273 # 04 Y:2008 04 2008 USE SOLAR HEAT TO HEAT WATER $10,101 $2,730 Not Implemented
LE0273 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,907 $214 Not Implemented
LE0273 # 06 Y:2008 06 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,118 $6,000 Not Implemented
LE0273 # 07 Y:2008 07 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,895 $7,800 Implemented
LE0273 # 08 Y:2008 08 2008 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $4,177 $3,120 Not Implemented
LE0273 # 09 Y:2008 09 2008 INSTALL OCCUPANCY SENSORS $381 $180 Not Implemented
LE0273 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,813 $42,521 Implemented
LL0293 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,156 $56,346 Not Implemented
LL0293 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $3,531 $655 Implemented
LL0293 # 03 Y:2008 03 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,733 $60 Implemented
LL0293 # 04 Y:2008 04 2008 USE PHOTOCELL CONTROLS $1,073 $60 Implemented
LL0293 # 05 Y:2008 05 2008 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $889 $45 Implemented
LL0293 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $819 $360 Implemented
LL0293 # 07 Y:2008 07 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $436 $501 Not Implemented
NC0376 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $100 Implemented
NC0376 # 08 Y:2008 08 2008 DEVELOP A REPAIR/REPLACE POLICY $4,903 $7,820 Implemented
NC0376 # 09 Y:2008 09 2008 USE PHOTOCELL CONTROLS $2,567 $1,900 Implemented