IAC Assessment: NC0376
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0376
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2008
Principal Product Fibercement siding
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 220,000
Annual Production 30,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $427,840 14,296,800 kWh $0.03
Electricity Demand $224,399 23,143 kW-months/year $9.70
Electricity Fees $19,567 - $ -
Natural Gas $1,118,700 125,373 MMBtu $8.92
TOTAL ENERGY COSTS $1,790,506
RECOMMENDED SAVINGS* $173,699 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,223
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,423
Cost:
$15,000
$8,549 285,920 $3,874 463 - - - - - - $8,549
285,920
kWh
$3,874
463
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$44,894
Cost:
$1,000
- - - - $44,894 5,033 - - - - -
-
kWh
-
-
kW-months/year
$44,894
5,033
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$32,459
Cost:
$75,000
- - - - $32,459 3,639 - - - - -
-
kWh
-
-
kW-months/year
$32,459
3,639
MMBtu
-
-
$
-
-
$
04: 2.2127 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM Savings:
$42,026
Cost:
$7,815
- - - - $42,026 4,711 - - - - -
-
kWh
-
-
kW-months/year
$42,026
4,711
MMBtu
-
-
$
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$21,163
Cost:
$50
$15,297 511,595 $5,866 701 - - - - - - $15,297
511,595
kWh
$5,866
701
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,635
Cost:
$3,500
- - - - $12,635 1,417 - - - - -
-
kWh
-
-
kW-months/year
$12,635
1,417
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$400
Cost:
$100
$1,026 34,322 $394 47 - - $(-720) - $(-300) - $1,026
34,322
kWh
$394
47
kW-months/year
-
-
MMBtu
$(-720)
-
$
$(-300)
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$4,903
Cost:
$7,820
$3,525 117,883 $1,378 165 - - - - - - $3,525
117,883
kWh
$1,378
165
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,567
Cost:
$1,900
$1,453 48,600 $1,114 133 - - - - - - $1,453
48,600
kWh
$1,114
133
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$229
Cost:
$507
$165 5,504 $64 8 - - - - - - $165
5,504
kWh
$64
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$173,699
Cost:
$112,692
$30,015 1,003,824 $12,690 1,517 $132,014 14,800 $(-720) - $(-300) - $30,015
1,003,824
kWh
$12,690
1,517
kW-months/year
$132,014
14,800
MMBtu
$(-720)
-
$
$(-300)
-
$
TOTAL IMPLEMENTED Savings:
$85,223
Cost:
$85,820
$6,004 200,805 $2,886 345 $77,353 8,672 $(-720) - $(-300) - $6,004
200,805
kWh
$2,886
345
kW-months/year
$77,353
8,672
MMBtu
$(-720)
-
$
$(-300)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost