Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0333 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,510 | $7,490 | Not Implemented |
LE0333 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,876 | $12,800 | Not Implemented |
LE0333 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,424 | $1,000 | Not Implemented |
LE0333 # 04 Y:2012 | 04 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,111 | $14,190 | Not Implemented |
LE0333 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,865 | $1,000 | Not Implemented |
LE0333 # 06 Y:2012 | 06 | 2012 | REDUCE HEAT GAIN BY WINDOW TINTING | $4,369 | $0 | Not Implemented |
LE0333 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,573 | $950 | Not Implemented |
LE0333 # 08 Y:2012 | 08 | 2012 | REDESIGN PROCESS | $513 | $5,280 | Not Implemented |
LE0332 # 01 Y:2012 | 01 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $66,813 | $0 | Not Implemented |
LE0332 # 02 Y:2012 | 02 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $16,976 | $7,660 | Not Implemented |
LE0332 # 03 Y:2012 | 03 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,677 | $25,375 | Not Implemented |
LE0332 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $9,659 | $24,370 | Not Implemented |
LE0332 # 05 Y:2012 | 05 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,856 | $28,000 | Not Implemented |
LE0332 # 06 Y:2012 | 06 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,328 | $23,400 | Not Implemented |
LE0332 # 07 Y:2012 | 07 | 2012 | DEVELOP STANDARD OPERATING PROCEDURES | $6,689 | $0 | Implemented |
LE0332 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,829 | $40 | Implemented |
LE0332 # 09 Y:2012 | 09 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,360 | $6,400 | Not Implemented |
LE0332 # 10 Y:2012 | 10 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $706 | $4,580 | Not Implemented |
WV0441 # 01 Y:2012 | 01 | 2012 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $200,857 | $610,000 | Not Implemented |
WV0441 # 02 Y:2012 | 02 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $78,225 | $74,340 | Not Implemented |
WV0441 # 03 Y:2012 | 03 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $73,647 | $33,378 | Implemented |
WV0441 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,675 | $91,200 | Implemented |
WV0441 # 05 Y:2012 | 05 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $49,557 | $11,000 | Implemented |
WV0441 # 06 Y:2012 | 06 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $38,793 | $10,750 | Implemented |
WV0441 # 07 Y:2012 | 07 | 2012 | INSULATE BARE EQUIPMENT | $20,023 | $6,777 | Not Implemented |