IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0124 # 07 Y:1994 07 1994 USE SYNTHETIC LUBRICANT $2,924 $3,915 Not Implemented
AS0124 # 08 Y:1994 08 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,997 $6,080 Implemented
AS0124 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,151 $0 Implemented
AS0124 # 10 Y:1994 10 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,158 $50,250 Not Implemented
IA0089 # 01 Y:1994 01 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,467 $30 Not Implemented
IA0089 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,121 $400 Implemented
IA0089 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,520 $185 Implemented
IA0089 # 04 Y:1994 04 1994 USE PHOTOCELL CONTROLS $554 $275 Not Implemented
IA0089 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $441 $693 Not Implemented
IA0090 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $19,385 $17,738 Implemented
IA0090 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,489 $500 Implemented
IA0090 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,257 $50 Not Implemented
IA0090 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,368 $1,803 Implemented
IA0090 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $578 $997 Not Implemented
IA0090 # 06 Y:1994 06 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $4,490 $12,600 Implemented
IA0090 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $918 $373 Implemented
MA0313 # 01 Y:1994 01 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $16,573 $31,939 Not Implemented
MA0313 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,198 $30,000 Not Implemented
MA0313 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,706 $2,248 Implemented
MA0313 # 04 Y:1994 04 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,203 $28,535 Not Implemented
MA0313 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $180 Implemented
MA0313 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $69,505 $30,000 Implemented
MA0313 # 07 Y:1994 07 1994 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $25,107 $30,000 Not Implemented
MA0313 # 08 Y:1994 08 1994 REDUCE OR ELIMINATE WASTE $386 $500 Implemented
KG0006 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $66,725 $1,260 Not Implemented