IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0859 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,512 $10,150 Not Implemented
UD0859 # 02 Y:2012 02 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $581 $600 Implemented
UD0859 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,313 $100 Not Implemented
UD0859 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,041 $2,000 Not Implemented
UD0859 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,953 $1,000 Implemented
UD0859 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $20,256 $6,033 Implemented
UD0859 # 07 Y:2012 07 2012 REDUCE EXCESS STEAM BLEEDING $20,148 $0 Implemented
UD0859 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,768 $2,000 Implemented
UD0859 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,869 $10,000 Not Implemented
UD0859 # 10 Y:2012 10 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $4,657 $5,000 Not Implemented
OK0829 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,021 $1,600 Implemented
OK0829 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,959 $33,990 Not Implemented
OK0829 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,968 $260,400 Not Implemented
OK0829 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $954 Not Implemented
OK0829 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $202 $1,139 Not Implemented
OK0829 # 06 Y:2012 06 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,221 $7,540 Not Implemented
OK0829 # 07 Y:2012 07 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,159 $417 Implemented
OK0829 # 08 Y:2012 08 2012 INSTALL SET-BACK TIMERS $3,516 $489 Not Implemented
OK0829 # 09 Y:2012 09 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,966 $80,748 Not Implemented
OK0829 # 10 Y:2012 10 2012 USE RADIANT HEATER FOR SPOT HEATING $8,164 $17,500 Not Implemented
CO0658 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,430 $850 Implemented
CO0658 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $7,240 $29,960 Not Implemented
CO0658 # 03 Y:2012 03 2012 USE PHOTOCELL CONTROLS $6,600 $4,680 Not Implemented
CO0658 # 04 Y:2012 04 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $5,660 $550 Implemented
CO0658 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,460 $9,100 Not Implemented