IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0591 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,647 $958 Implemented
WV0591 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,896 $1,770 Not Implemented
WV0591 # 07 Y:2020 07 2020 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,752 $4,700 Implemented
WV0591 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $834 $50 Not Implemented
WV0591 # 09 Y:2020 09 2020 DEVELOP A REPAIR/REPLACE POLICY $944 $338 Implemented
WV0591 # 10 Y:2020 10 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $507 $2,500 Not Implemented
WV0591 # 11 Y:2020 11 2020 INSULATE BARE EQUIPMENT $151 $373 Implemented
WV0591 # 12 Y:2020 12 2020 INSULATE BARE EQUIPMENT $98 $360 Not Implemented
CL2005 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $4,518 Implemented
CL2005 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $43,911 $200,000 Not Implemented
CL2005 # 03 Y:2020 03 2020 REDUCE FLUID FLOW RATES $16,601 $17,611 Not Implemented
AM0800 # 01 Y:2020 01 2020 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $487,100 $3,000 Implemented
AM0800 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $2,460 Implemented
AM0800 # 03 Y:2020 03 2020 PAY UTILITY BILLS ON TIME $2,148 $0 Implemented
AM0800 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,700 $267 Implemented
AM0800 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $40 Implemented
AM0800 # 06 Y:2020 06 2020 USE SYNTHETIC LUBRICANT $395 $150 Implemented
MA0815 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $90,005 $373,605 Not Implemented
MA0815 # 02 Y:2020 02 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $33,419 $150,000 Not Implemented
MA0815 # 03 Y:2020 03 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,675 $375 Implemented
MA0815 # 04 Y:2020 04 2020 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,358 $250 Not Implemented
MA0815 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,596 $24,389 Implemented
MA0815 # 06 Y:2020 06 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,915 $250 Not Implemented
GT0944 # 01 Y:2020 01 2020 CHECK FOR ACCURACY OF UTILITY / POWER METERS $83,286 $2,000 Implemented
GT0944 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,307 $300 Not Implemented