IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0115 # 04 Y:1988 04 1988 REDUCE EXCESS STEAM BLEEDING $3,914 $2,000 Implemented
CO0115 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $4,410 $10,670 Implemented
CO0115 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,111 $0 Implemented
CO0115 # 07 Y:1988 07 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,557 $38,200 Implemented
CO0116 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $151,329 $7,000 Implemented
CO0116 # 02 Y:1988 02 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $753 $18,000 Implemented
CO0116 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,758 $0 Implemented
CO0116 # 04 Y:1988 04 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,814 $7,000 Implemented
CO0116 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $3,390 $375 Not Implemented
CO0116 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $107,194 $100,000 Implemented
CO0117 # 01 Y:1988 01 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $4,830 $10,130 Implemented
CO0117 # 02 Y:1988 02 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,702 $139,000 Implemented
CO0117 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,167 $0 Implemented
CO0117 # 04 Y:1988 04 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $858 $1,000 Implemented
CO0117 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,747 $6,500 Implemented
CO0117 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $56,432 $60,000 Not Implemented
CO0118 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,130 $2,000 Implemented
CO0118 # 02 Y:1988 02 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,044 $8,000 Not Implemented
CO0118 # 03 Y:1988 03 1988 USE MINIMUM STEAM OPERATING PRESSURE $148 $25 Not Implemented
CO0118 # 04 Y:1988 04 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $522 $700 Implemented
CO0118 # 05 Y:1988 05 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,193 $500 Implemented
CO0119 # 01 Y:1988 01 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $711 $500 Implemented
CO0119 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $375 Implemented
CO0119 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $889 $0 Implemented
CO0119 # 04 Y:1988 04 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,270 $10,400 Not Implemented