Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0111 # 02 Y:2005 | 02 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $13,290 | $84 | Implemented |
MI0111 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,062 | $7,706 | Implemented |
MI0111 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,249 | $0 | Not Implemented |
MI0111 # 05 Y:2005 | 05 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $873 | $1,673 | Not Implemented |
TA0097 # 01 Y:2005 | 01 | 2005 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $8,253 | $0 | Implemented |
TA0097 # 02 Y:2005 | 02 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,829 | $176 | Not Implemented |
TA0097 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,341 | $1,038 | Implemented |
TA0097 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,277 | $0 | Not Implemented |
TA0097 # 05 Y:2005 | 05 | 2005 | INSTALL OCCUPANCY SENSORS | $2,486 | $270 | Not Implemented |
TA0097 # 06 Y:2005 | 06 | 2005 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $2,320 | $50 | Not Implemented |
TA0097 # 07 Y:2005 | 07 | 2005 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $1,904 | $0 | Implemented |
AS0403 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,641 | $1,000 | Not Implemented |
AS0403 # 02 Y:2005 | 02 | 2005 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $16,622 | $10,000 | Not Implemented |
AS0403 # 03 Y:2005 | 03 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $15,050 | $2,000 | Not Implemented |
AS0403 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,834 | $27,518 | Not Implemented |
AS0403 # 05 Y:2005 | 05 | 2005 | USE SOLAR HEAT TO HEAT WATER | $580 | $3,600 | Not Implemented |
LE0217 # 01 Y:2005 | 01 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $33,752 | $27,000 | Not Implemented |
LE0217 # 02 Y:2005 | 02 | 2005 | KEEP EQUIPMENT CLEAN | $28,000 | $840 | Implemented |
LE0217 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $16,487 | $6,845 | Implemented |
LE0217 # 04 Y:2005 | 04 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,186 | $3,000 | Not Implemented |
LE0217 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,202 | $4,000 | Not Implemented |
LE0217 # 06 Y:2005 | 06 | 2005 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,764 | $900 | Implemented |
LE0217 # 07 Y:2005 | 07 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,158 | $900 | Implemented |
LE0217 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,372 | $263 | Implemented |
LE0217 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,389 | $240 | Not Implemented |