Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0815 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $90,005 | $373,605 | Not Implemented |
MA0815 # 02 Y:2020 | 02 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $33,419 | $150,000 | Not Implemented |
MA0815 # 03 Y:2020 | 03 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,675 | $375 | Implemented |
MA0815 # 04 Y:2020 | 04 | 2020 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,358 | $250 | Not Implemented |
MA0815 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,596 | $24,389 | Implemented |
MA0815 # 06 Y:2020 | 06 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,915 | $250 | Not Implemented |
UF0550 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $41,888 | $29,990 | Implemented |
UF0550 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,802 | $30,000 | Implemented |
UF0550 # 03 Y:2020 | 03 | 2020 | INSTALL TURBULATORS | $3,921 | $11,250 | Implemented |
UF0550 # 04 Y:2020 | 04 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,928 | $2,800 | Implemented |
UF0550 # 05 Y:2020 | 05 | 2020 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $383,788 | $897,972 | Implemented |
LE0493 # 01 Y:2020 | 01 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,226 | $0 | Not Implemented |
LE0493 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,392 | $40 | Not Implemented |
LE0493 # 03 Y:2020 | 03 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $1,943 | $120 | Not Implemented |
LE0493 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,484 | $4,000 | Not Implemented |
LE0493 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,371 | $3,160 | Not Implemented |
LE0493 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,494 | $9,550 | Not Implemented |
LE0493 # 07 Y:2020 | 07 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,282 | $10,500 | Not Implemented |
LE0493 # 08 Y:2020 | 08 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,861 | $42,000 | Not Implemented |
CW0111 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $577 | $50 | Implemented |
CW0111 # 02 Y:2020 | 02 | 2020 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,231 | $200 | Implemented |
CW0111 # 03 Y:2020 | 03 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,856 | $0 | Not Implemented |
CW0111 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $1,147 | $3,000 | Implemented |
CW0111 # 05 Y:2020 | 05 | 2020 | RECYCLE WHITE WATER | $1,133 | $0 | Not Implemented |
CW0111 # 06 Y:2020 | 06 | 2020 | USE DEIONIZED WATER IN UPSTREAM RINSE TANKS | $39,911 | $4,800 | Implemented |