IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0944 # 03 Y:2020 03 2020 UPGRADE CONTROLS ON COMPRESSORS $47,317 $4,200 Implemented
GT0944 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,117 $1,000 Not Implemented
GT0944 # 05 Y:2020 05 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $9,591 $2,000 Implemented
GT0944 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,478 $20,506 Implemented
GT0944 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $4,110 $3,531 Not Implemented
GT0944 # 08 Y:2020 08 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $456 $1,404 Not Implemented
UF0550 # 01 Y:2020 01 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $41,888 $29,990 Implemented
UF0550 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,802 $30,000 Implemented
UF0550 # 03 Y:2020 03 2020 INSTALL TURBULATORS $3,921 $11,250 Implemented
UF0550 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,928 $2,800 Implemented
UF0550 # 05 Y:2020 05 2020 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $383,788 $897,972 Implemented
CW0111 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $577 $50 Implemented
CW0111 # 02 Y:2020 02 2020 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,231 $200 Implemented
CW0111 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,856 $0 Not Implemented
CW0111 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $1,147 $3,000 Implemented
CW0111 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $1,133 $0 Not Implemented
CW0111 # 06 Y:2020 06 2020 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS $39,911 $4,800 Implemented
CW0111 # 07 Y:2020 07 2020 AVOID FROST FORMATION ON EVAPORATORS $27,066 $28,000 Implemented
LE0493 # 01 Y:2020 01 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,226 $0 Not Implemented
LE0493 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,392 $40 Not Implemented
LE0493 # 03 Y:2020 03 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,943 $120 Not Implemented
LE0493 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,484 $4,000 Not Implemented
LE0493 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,371 $3,160 Not Implemented
LE0493 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,494 $9,550 Not Implemented
LE0493 # 07 Y:2020 07 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,282 $10,500 Not Implemented