IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2308 # 07 Y:2023 07 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,871 $15,000 Not Implemented
UL2307 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,100 $2,693 Implemented
UL2307 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,654 $33,973 Implemented
UL2307 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,834 $0 Not Implemented
UL2307 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $38,660 $22,666 Not Implemented
UL2307 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $38,855 $480,889 Not Implemented
UL2307 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,752 $14,626 Not Implemented
UL2307 # 07 Y:2023 07 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $36,790 $34,740 Implemented
UL2307 # 08 Y:2023 08 2023 RECOVER WASTE HEAT FROM EQUIPMENT $46,192 $39,000 Not Implemented
UL2306 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,019 $0 Not Implemented
UL2306 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $336 $600 Implemented
UL2306 # 03 Y:2023 03 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,595 $12,891 Not Implemented
UL2306 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $30,055 $314,019 Not Implemented
UL2306 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $103,804 $14,859 Not Implemented
UL2305 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $3,238 $9,672 Not Implemented
UL2305 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $25,542 $325,397 Not Implemented
UL2305 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,322 $500 Implemented
UL2305 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,439 $0 Not Implemented
UL2305 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,738 $0 Implemented
UL2305 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,763 $9,750 Not Implemented
UL2305 # 07 Y:2023 07 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $29,120 $60,633 Not Implemented
UL2305 # 08 Y:2023 08 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,779 $0 Implemented
TT0296 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,069 $270 Not Implemented
TT0296 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $66,640 $2,000 Not Implemented
TT0296 # 03 Y:2023 03 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $200,000 $10,000 Not Implemented