IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,283

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0647 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $2,488 $5,708 Not Implemented
NC0647 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $192 $135 Not Implemented
NC0647 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,880 $5,000 Not Implemented
NC0647 # 05 Y:2020 05 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $124,057 $600,000 Not Implemented
NC0630 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,928 $68,859 Implemented
NC0630 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $472 $100 Implemented
NC0630 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,108 $1,892 Implemented
NC0630 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $1,318 $4,000 Not Implemented
NC0630 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,320 $1,855 Implemented
NC0643 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,445 $139,040 Implemented
NC0643 # 02 Y:2019 02 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $9,495 $1,000 Implemented
NC0643 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,881 $30,000 Not Implemented
NC0643 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $34,280 $75,000 Not Implemented
NC0643 # 05 Y:2019 05 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $77,463 $300,000 Not Implemented
NC0644 # 01 Y:2019 01 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $28,909 $65,575 Implemented
NC0644 # 02 Y:2019 02 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $23,191 $30,000 Implemented
NC0644 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,841 $25,826 Implemented
NC0644 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,639 $0 Not Implemented
NC0644 # 05 Y:2019 05 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,800 $0 Not Implemented
NC0644 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,387 $50,000 Not Implemented
NC0637 # 01 Y:2019 01 2019 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $23,778 $10,000 Not Implemented
NC0637 # 02 Y:2019 02 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,505 $30,000 Not Implemented
NC0637 # 03 Y:2019 03 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $20,241 $210,000 Not Implemented
NC0637 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $1,499 $12,000 Not Implemented
NC0642 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $214 $1,000 Not Implemented