IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0376 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,750 $387 Implemented
WV0376 # 11 Y:2008 11 2008 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,649 $0 Implemented
WV0376 # 12 Y:2008 12 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $984 $52 Not Implemented
WV0376 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $963 $1,431 Implemented
WV0376 # 14 Y:2008 14 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $610 $196 Implemented
WV0376 # 15 Y:2008 15 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $484 $200 Implemented
DL0011 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $19,525 $0 Implemented
DL0011 # 02 Y:2008 02 2008 UPGRADE CONTROLS ON COMPRESSORS $9,089 $10,000 Not Implemented
DL0011 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,807 $160 Not Implemented
DL0011 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $1,472 $268 Not Implemented
DL0011 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $165 $127 Implemented
DL0011 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,968 $36,000 Implemented
DL0011 # 07 Y:2008 07 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $63,226 $1,600,000 Not Implemented
WV0375 # 01 Y:2008 01 2008 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,181,139 $1,147,130 Not Implemented
WV0375 # 02 Y:2008 02 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $396,584 $183,040 Implemented
WV0375 # 03 Y:2008 03 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $250,246 $168,224 Implemented
WV0375 # 04 Y:2008 04 2008 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $97,283 $434,500 Not Implemented
WV0375 # 05 Y:2008 05 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $84,029 $50,400 Not Implemented
WV0375 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,382 $83,840 Implemented
WV0375 # 07 Y:2008 07 2008 USE RADIANT HEATER FOR SPOT HEATING $23,729 $37,200 Not Implemented
WV0375 # 08 Y:2008 08 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $59,537 $62,535 Not Implemented
WV0375 # 09 Y:2008 09 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $57,494 $25,520 Not Implemented
WV0375 # 10 Y:2008 10 2008 RECOVER WASTE HEAT FROM EQUIPMENT $34,143 $15,525 Not Implemented
WV0375 # 11 Y:2008 11 2008 USE OPTIMUM THICKNESS INSULATION $33,427 $6,567 Implemented
WV0375 # 12 Y:2008 12 2008 DEVELOP A REPAIR/REPLACE POLICY $32,477 $1,338 Implemented