Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,777
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0390 # 07 Y:1992 | 07 | 1992 | INSTALL SET-BACK TIMERS | $302 | $302 | Implemented |
AM0165 # 01 Y:1992 | 01 | 1992 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $23,570 | $1,350 | Implemented |
AM0165 # 02 Y:1992 | 02 | 1992 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $6,300 | $3,630 | Implemented |
AM0165 # 03 Y:1992 | 03 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,915 | $3,450 | Not Implemented |
AM0165 # 04 Y:1992 | 04 | 1992 | REDUCE FLUID FLOW RATES | $2,710 | $0 | Not Implemented |
AM0165 # 05 Y:1992 | 05 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,750 | $0 | Not Implemented |
AM0165 # 06 Y:1992 | 06 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,330 | $2,520 | Implemented |
AM0165 # 07 Y:1992 | 07 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $920 | $920 | Not Implemented |
AM0165 # 08 Y:1992 | 08 | 1992 | INSTALL SET-BACK TIMERS | $150 | $190 | Implemented |
OK0389 # 01 Y:1992 | 01 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,084 | $200 | Implemented |
OK0389 # 02 Y:1992 | 02 | 1992 | KEEP LAMPS AND REFLECTORS CLEAN | $2,686 | $6,210 | Not Implemented |
OK0389 # 03 Y:1992 | 03 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,437 | $1,350 | Implemented |
OK0389 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $941 | $1,348 | Implemented |
OK0389 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $262 | $1,385 | Implemented |
OK0389 # 06 Y:1992 | 06 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $371 | $203 | Not Implemented |
OK0389 # 07 Y:1992 | 07 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $201 | $683 | Not Implemented |
OK0389 # 08 Y:1992 | 08 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $264 | $147 | Not Implemented |
OK0388 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,461 | $1,798 | Implemented |
OK0388 # 02 Y:1992 | 02 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,508 | $11,034 | Implemented |
OK0388 # 03 Y:1992 | 03 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $482 | $1,424 | Not Implemented |
OK0388 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $231 | $0 | Not Implemented |
OK0388 # 05 Y:1992 | 05 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $297 | $0 | Implemented |
OR0164 # 01 Y:1992 | 01 | 1992 | OPERATE BOILERS ON HIGH FIRE SETTING | $3,115 | $0 | Not Implemented |
OR0164 # 02 Y:1992 | 02 | 1992 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,608 | $0 | Implemented |
OR0164 # 03 Y:1992 | 03 | 1992 | RECOVER MECHANICAL ENERGY | $929 | $0 | Implemented |