Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50,056
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0210 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,730 | $24 | n/a |
UU0270 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,350 | $15,900 | n/a |
UU0270 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,940 | $105,710 | n/a |
UU0270 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,825 | $17,730 | n/a |
UU0270 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $645 | $820 | n/a |
UU0270 # 05 Y:2025 | 05 | 2025 | PAY UTILITY BILLS ON TIME | $700 | $1,650 | n/a |
UU0270 # 06 Y:2025 | 06 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $17,175 | $12,320 | n/a |
UU0271 # 01 Y:2025 | 01 | 2025 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,038 | $1,248 | n/a |
UU0271 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $133 | $1,175 | n/a |
UU0271 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,296 | $11,327 | n/a |
UU0271 # 04 Y:2025 | 04 | 2025 | MINIMIZE WATER USAGE | $3,231 | $23,282 | n/a |
UU0271 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $771 | $5,877 | n/a |
UU0271 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,046 | $20,000 | n/a |
UU0271 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $335 | $648 | n/a |
AS0610 # 01 Y:2025 | 01 | 2025 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,349 | $16,000 | n/a |
AS0610 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $2,279 | $2,835 | n/a |
AS0610 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,708 | $950 | n/a |
AS0610 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,539 | $1,975 | n/a |
AS0610 # 05 Y:2025 | 05 | 2025 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,308 | $61 | n/a |
AS0610 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $893 | $510 | n/a |
AS0610 # 07 Y:2025 | 07 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $176 | $187 | n/a |
UL2504 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $223 | $168 | n/a |
UL2504 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,017 | $630 | n/a |
UL2504 # 03 Y:2025 | 03 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $10,447 | $57,490 | n/a |
UL2504 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $45,536 | $20,280 | n/a |