IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0380 # 02 Y:1992 02 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,269 $73,000 Not Implemented
KU0380 # 03 Y:1992 03 1992 RECOVER AND REUSE COOLING WATER $19,128 $0 Not Implemented
KU0380 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,815 $1,000 Not Implemented
KU0380 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $715 $500 Not Implemented
KU0380 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $3,220 $4,298 Implemented
KU0380 # 07 Y:1992 07 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,034 $4,860 Implemented
KU0380 # 08 Y:1992 08 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,375 $3,500 Implemented
KU0380 # 09 Y:1992 09 1992 INSTALL TURBULATORS $1,424 $1,000 Implemented
KU0380 # 10 Y:1992 10 1992 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,875 $2,500 Not Implemented
KU0380 # 11 Y:1992 11 1992 INSTALL SET-BACK TIMERS $1,153 $1,200 Not Implemented
KU0380 # 12 Y:1992 12 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8 $0 Implemented
KU0381 # 01 Y:1992 01 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,545 $20 Implemented
KU0381 # 02 Y:1992 02 1992 AIR CONDITION ONLY SPACE NECESSARY $472 $2,300 Not Implemented
KU0381 # 03 Y:1992 03 1992 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $150 $30 Implemented
KU0381 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $751 $700 Implemented
KU0381 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $0 Not Implemented
KU0381 # 06 Y:1992 06 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $667 $0 Not Implemented
KU0381 # 07 Y:1992 07 1992 RECOVER WASTE HEAT FROM EQUIPMENT $450 $716 Implemented
KU0381 # 08 Y:1992 08 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $322 $0 Implemented
KU0381 # 09 Y:1992 09 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $429 $1,400 Implemented
KU0375 # 01 Y:1992 01 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,449 $20,000 Implemented
KU0375 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,970 $525 Implemented
KU0375 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,071 $1,500 Not Implemented
KU0375 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $621 $150 Implemented
KU0375 # 05 Y:1992 05 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,252 $0 Not Implemented