IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,969

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0331 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $475 $0 Implemented
MA0331 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $398 $422 Implemented
MA0328 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,528 $44,433 Implemented
MA0328 # 02 Y:1995 02 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,793 $9,350 Not Implemented
MA0328 # 03 Y:1995 03 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,972 $3,068 Not Implemented
MA0328 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,889 $540 Implemented
MA0328 # 05 Y:1995 05 1995 USE PHOTOCELL CONTROLS $1,851 $286 Implemented
MA0328 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,432 $3,380 Not Implemented
MA0328 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $985 $1,440 Implemented
MA0328 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $477 $0 Implemented
MA0328 # 09 Y:1995 09 1995 INSTALL OCCUPANCY SENSORS $348 $298 Not Implemented
MA0328 # 10 Y:1995 10 1995 DISTILL CONTAMINATED SOLVENTS FOR REUSE $12,875 $19,300 Not Implemented
MA0328 # 11 Y:1995 11 1995 RECOVER AND REUSE COOLING WATER $11,258 $14,000 Not Implemented
MA0328 # 12 Y:1995 12 1995 RECYCLE CLEANING SOLVENT AND REUSE $61,905 $5,000 Not Implemented
MA0328 # 13 Y:1995 13 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,755 $16,400 Implemented
MA0327 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,783 $0 Implemented
MA0327 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,094 $90,000 Not Implemented
MA0327 # 03 Y:1995 03 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,441 $36,400 Implemented
MA0327 # 04 Y:1995 04 1995 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $9,488 $0 Implemented
MA0327 # 05 Y:1995 05 1995 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,033 $0 Implemented
MA0327 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,001 $12,431 Not Implemented
MA0327 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,226 $0 Not Implemented
MA0327 # 08 Y:1995 08 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,903 $1,500 Implemented
MA0327 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $0 Implemented
MA0327 # 10 Y:1995 10 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $500 Not Implemented