IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0281 # 11 Y:2015 11 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $149 $346 Implemented
OK0918 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,107 $30,228 Not Implemented
OK0918 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $9,764 $29,490 Not Implemented
OK0918 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,801 $8,234 Not Implemented
OK0918 # 04 Y:2015 04 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,151 $4,000 Not Implemented
OK0918 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $80,375 $97,500 Not Implemented
OK0918 # 06 Y:2015 06 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $7,464 $1,177 Not Implemented
OK0918 # 07 Y:2015 07 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,374 $0 Implemented
OK0918 # 08 Y:2015 08 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,167 $2,205 Not Implemented
OK0918 # 09 Y:2015 09 2015 INSTALL SET-BACK TIMERS $1,944 $0 Not Implemented
OK0918 # 10 Y:2015 10 2015 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $1,481 $0 Implemented
OK0918 # 11 Y:2015 11 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $27,241 $2,175 Not Implemented
OR0650 # 01 Y:2015 01 2015 ELIMINATE/REDUCE AN OPERATION $20,348 $2,295 Not Implemented
OR0650 # 02 Y:2015 02 2015 IMPROVE COMBUSTION CONTROL CAPABILITY $23,922 $24,660 Not Implemented
OR0650 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $719 $1,200 Implemented
OR0650 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,001 $2,678 Not Implemented
OR0650 # 05 Y:2015 05 2015 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $1,291 $4,404 Implemented
OR0650 # 06 Y:2015 06 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $16,731 $135,510 Not Implemented
UM0461 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $940 $800 Not Implemented
UM0461 # 02 Y:2015 02 2015 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,840 $475 Not Implemented
UM0461 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,057 $2,000 Implemented
UM0461 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,928 $1,000 Implemented
UM0461 # 05 Y:2015 05 2015 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $479 $200 Not Implemented
UM0461 # 06 Y:2015 06 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $195 $1,000 Not Implemented
UM0461 # 07 Y:2015 07 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,782 $3,000 Not Implemented