IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MUCM12 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $166 $89 Not Implemented
MUCM12 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $848 $2,033 Implemented
MUCM12 # 05 Y:2023 05 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,740 $880 Not Implemented
MUCM12 # 06 Y:2023 06 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $403 $107 Not Implemented
TT0301 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $47,506 $76,760 Not Implemented
TT0301 # 02 Y:2023 02 2023 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $40,702 $210,000 Not Implemented
TT0301 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,720 $15,200 Implemented
TT0301 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,607 $0 Implemented
TT0301 # 05 Y:2023 05 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,886 $220 Implemented
TT0301 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,899 $1,500 Implemented
IC0284 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,480 $3,669 Implemented
IC0284 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,864 $0 Implemented
IC0284 # 03 Y:2023 03 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $445 $0 Implemented
IC0284 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $556 $897 Implemented
IC0284 # 05 Y:2023 05 2023 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $152,337 $14,315 Not Implemented
IC0284 # 06 Y:2023 06 2023 PURCHASE EQUIPMENT INSTEAD OF LEASING $192,600 $121,203 Implemented
IC0284 # 07 Y:2023 07 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $415 $0 Implemented
IC0284 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $190 $379 Implemented
KS2320 # 01 Y:2023 01 2023 ISOLATE HOT OR COLD EQUIPMENT $5,723 $1,804 n/a
KS2320 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,340 $60 n/a
KS2320 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,903 $0 n/a
KS2320 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,227 $16,176 n/a
KS2320 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $54,630 $421,943 n/a
LE0552 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $608 $100 Implemented
LE0552 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $790 $570 Implemented