IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0492 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,415 $6,000 Not Implemented
LE0492 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,255 $2,500 Not Implemented
LE0492 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,434 $5,800 Not Implemented
LE0492 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,300 $8,123 Implemented
LE0492 # 07 Y:2020 07 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,220 $17,000 Not Implemented
AS0481 # 01 Y:2020 01 2020 USE POWER DURING OFF-PEAK PERIODS $7,396 $298 Implemented
AS0481 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,249 $1,100 Not Implemented
AS0481 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,880 $2,996 Not Implemented
AS0481 # 04 Y:2020 04 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,159 $9,000 Not Implemented
AS0481 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,068 $540 Not Implemented
AS0481 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $706 $912 Implemented
AS0481 # 07 Y:2020 07 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $59 $113 Not Implemented
GT0943 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,005 $563 Implemented
GT0943 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $4,323 $2,678 Implemented
GT0943 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $490 $350 Not Implemented
GT0943 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,306 $3,500 Implemented
GT0943 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $736 $1,938 Implemented
GT0943 # 06 Y:2020 06 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $27,227 $225,984 Not Implemented
MI0370 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,466 $26,940 Not Implemented
MI0370 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,944 $53,621 Not Implemented
MI0370 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,446 $2,260 Not Implemented
MI0370 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $7,381 $10,120 Not Implemented
MI0370 # 05 Y:2020 05 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,983 $580 Implemented
MI0370 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,663 $120 Implemented
MI0370 # 07 Y:2020 07 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $4,066 $480 Implemented