IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,263

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0215 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,452 $845 Not Implemented
LL0215 # 05 Y:2005 05 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $764 $240 Not Implemented
LL0215 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $753 $240 Not Implemented
LL0215 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $814 $525 Not Implemented
LL0215 # 08 Y:2005 08 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,740 $490 Not Implemented
LL0214 # 01 Y:2005 01 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,955 $1,014 Implemented
LL0214 # 02 Y:2005 02 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,110 $240 Implemented
LL0214 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $921 $595 Not Implemented
LL0214 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $797 $180 Not Implemented
LL0214 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $637 $400 Implemented
LL0214 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $413 $30 Implemented
LL0214 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $324 $120 Implemented
LL0214 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $157 $120 Implemented
LL0214 # 09 Y:2005 09 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,880 $3,995 Implemented
LL0214 # 10 Y:2005 10 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,500 $2,100 Implemented
LL0213 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $479,962 $1,400,000 Implemented
LL0213 # 02 Y:2004 02 2004 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $55,846 $100,000 Not Implemented
LL0213 # 03 Y:2004 03 2004 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $47,454 $108,000 Not Implemented
LL0213 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,231 $4,806 Implemented
LL0213 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,028 $1,485 Implemented
LL0213 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,862 $6,160 Implemented
LL0213 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,051 $2,550 Not Implemented
LL0213 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $1,146 $492 Implemented
LL0213 # 09 Y:2004 09 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $67,520 $4,000 Implemented
LL0207 # 01 Y:2004 01 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,769 $16,000 Implemented