Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,996
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0169 # 03 Y:1997 | 03 | 1997 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,357 | $4,900 | Implemented |
IA0169 # 04 Y:1997 | 04 | 1997 | REDUCE VENTILATION AIR | $2,334 | $40 | Implemented |
IA0169 # 05 Y:1997 | 05 | 1997 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,649 | $7,400 | Not Implemented |
IA0169 # 06 Y:1997 | 06 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,535 | $4,500 | Not Implemented |
IA0169 # 07 Y:1997 | 07 | 1997 | REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT | $4,866 | $2,300 | Not Implemented |
IA0169 # 08 Y:1997 | 08 | 1997 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $1,124 | $0 | Not Implemented |
IA0169 # 09 Y:1997 | 09 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $665 | $110 | Implemented |
IA0169 # 10 Y:1997 | 10 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $229 | $14 | Not Implemented |
IA0169 # 11 Y:1997 | 11 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $103 | $205 | Implemented |
BD0090 # 01 Y:1997 | 01 | 1997 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $33,305 | $30,062 | Implemented |
BD0090 # 02 Y:1997 | 02 | 1997 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,088 | $17,646 | Implemented |
BD0090 # 03 Y:1997 | 03 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,924 | $13,880 | Not Implemented |
BD0090 # 04 Y:1997 | 04 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,231 | $950 | Implemented |
BD0090 # 05 Y:1997 | 05 | 1997 | INSTALL OCCUPANCY SENSORS | $3,769 | $2,250 | Implemented |
BD0090 # 06 Y:1997 | 06 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,289 | $0 | Not Implemented |
BD0090 # 07 Y:1997 | 07 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,069 | $2,035 | Implemented |
BD0090 # 08 Y:1997 | 08 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $31,686 | $29,850 | Implemented |
BD0090 # 09 Y:1997 | 09 | 1997 | USE A RAG RECYCLE SERVICE | $3,953 | $0 | Implemented |
BD0090 # 10 Y:1997 | 10 | 1997 | CLEAR AND RENT EXISTING SPACE | $12,408 | $480 | Implemented |
AS0208 # 01 Y:1997 | 01 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,162 | $2,895 | Implemented |
AS0208 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,087 | $8,920 | Implemented |
AS0208 # 03 Y:1997 | 03 | 1997 | INSTALL OCCUPANCY SENSORS | $796 | $1,575 | Not Implemented |
AS0208 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,864 | $8,680 | Not Implemented |
AS0208 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,343 | $40,705 | Not Implemented |
AS0208 # 06 Y:1997 | 06 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,546 | $16,449 | Implemented |