IAC Assessment: BD0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1997
Principal Product Harvesters
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 350,000
Annual Production 12 Pieces
Production Hrs. Annual 4,680
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,220 4,148,300 kWh $0.03
Electricity Demand $152,574 12,250 kW-months/year $12.46
Electricity Fees $331 - $ -
Natural Gas $131,447 26,928 MMBtu $4.88
TOTAL ENERGY COSTS $444,814
RECOMMENDED SAVINGS* $106,722 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,509
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$33,305
Cost:
$30,062
- - - - $33,305 7,193 - - - - - - - - -
-
kWh
-
-
kW-months/year
$33,305
7,193
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$8,088
Cost:
$17,646
- - - - $8,088 1,797 - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,088
1,797
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,924
Cost:
$13,880
$2,732 83,236 $4,192 337 - - - - - - - - - - $2,732
83,236
kWh
$4,192
337
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,231
Cost:
$950
- - - - $4,231 914 - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,231
914
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,769
Cost:
$2,250
$2,834 86,460 $935 75 - - - - - - - - - - $2,834
86,460
kWh
$935
75
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,289
Cost:
-
$1,289 39,273 - - - - - - - - - - - - $1,289
39,273
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,069
Cost:
$2,035
$461 14,068 $608 49 - - - - - - - - - - $461
14,068
kWh
$608
49
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$31,686
Cost:
$29,850
- - - - - - - - - - $26,273 - $5,413 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$26,273
-
$
$5,413
-
$
09: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$3,953
Cost:
-
- - - - - - $3,953 1,048 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,953
1,048
lb
-
-
$
-
-
$
-
-
$
10: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$12,408
Cost:
$480
- - - - - - - - $12,408 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$12,408
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$106,722
Cost:
$97,153
$7,316 223,037 $5,735 461 $45,624 9,904 $3,953 1,048 $12,408 - $26,273 - $5,413 - $7,316
223,037
kWh
$5,735
461
kW-months/year
$45,624
9,904
MMBtu
$3,953
1,048
lb
$12,408
-
$
$26,273
-
$
$5,413
-
$
TOTAL IMPLEMENTED Savings:
$98,509
Cost:
$83,273
$3,295 100,528 $1,543 124 $45,624 9,904 $3,953 1,048 $12,408 - $26,273 - $5,413 - $3,295
100,528
kWh
$1,543
124
kW-months/year
$45,624
9,904
MMBtu
$3,953
1,048
lb
$12,408
-
$
$26,273
-
$
$5,413
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Primary Raw Material Ancillary Material Cost