IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0238 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,980 $26,000 Not Implemented
NC0238 # 04 Y:2002 04 2002 KEEP BOILER TUBES CLEAN $11,529 $50,000 Not Implemented
NC0238 # 05 Y:2002 05 2002 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $100,000 $35,000 Not Implemented
NC0238 # 06 Y:2002 06 2002 REPAIR OR REPLACE STEAM TRAPS $10,000 $9,340 Implemented
NC0238 # 07 Y:2002 07 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $1,112 $2,405 Implemented
NC0238 # 08 Y:2002 08 2002 INSULATE BARE EQUIPMENT $15,915 $5,922 Not Implemented
NC0238 # 09 Y:2002 09 2002 INSULATE BARE EQUIPMENT $14,570 $17,855 Not Implemented
NC0238 # 10 Y:2002 10 2002 INCREASE AMOUNT OF CONDENSATE RETURNED $4,818 $6,000 Implemented
NC0238 # 11 Y:2002 11 2002 DEVELOP A REPAIR/REPLACE POLICY $6,185 $17,736 Implemented
NC0238 # 12 Y:2002 12 2002 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,536 $1,500 Implemented
NC0238 # 13 Y:2002 13 2002 RECOVER WASTE HEAT FROM EQUIPMENT $93,319 $15,000 Implemented
NC0238 # 14 Y:2002 14 2002 UPGRADE OBSOLETE EQUIPMENT $3,325,357 $914,253 Not Implemented
GT0740 # 01 Y:2002 01 2002 UPGRADE CONTROLS ON COMPRESSORS $1,545 $0 Implemented
GT0740 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,056 $2,500 Implemented
GT0740 # 03 Y:2002 03 2002 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $62,171 $130,800 Not Implemented
GT0740 # 04 Y:2002 04 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,365 $0 Not Implemented
GT0740 # 05 Y:2002 05 2002 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,122 $1,000 Not Implemented
GT0740 # 06 Y:2002 06 2002 $130,680 $10,300 Not Implemented
GT0740 # 07 Y:2002 07 2002 MINIMIZE WATER USAGE $11,020 $21,250 Not Implemented
IA0292 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,757 $1,256 Implemented
IA0292 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,700 $264 Implemented
IA0292 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,277 $688 Not Implemented
IA0292 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $347 $509 Not Implemented
IA0292 # 05 Y:2002 05 2002 $133,875 $21,450 Not Implemented
IA0292 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,372 $5,765 Not Implemented