IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0388 # 06 Y:2009 06 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,424 $6,259 Implemented
WV0388 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,366 $3,122 Implemented
WV0388 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,801 $34 Implemented
WV0388 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,757 $4,680 Not Implemented
WV0388 # 10 Y:2009 10 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $749 $572 Not Implemented
WV0388 # 11 Y:2009 11 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $321 $0 Not Implemented
WV0388 # 12 Y:2009 12 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $282 $590 Not Implemented
WV0388 # 13 Y:2009 13 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $246 $400 Not Implemented
IC0155 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $338 $525 Implemented
IC0155 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,751 $32,000 Implemented
IC0155 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $7,147 $6,214 Implemented
IC0155 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,354 $112,227 Implemented
IC0155 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,637 $2,750 Implemented
IC0155 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $576 $0 Not Implemented
IC0155 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,086 $1,265 Not Implemented
IC0155 # 08 Y:2009 08 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,037 $0 Not Implemented
NC0388 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,869 $25,000 Not Implemented
NC0388 # 02 Y:2009 02 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $400 $10,000 Implemented
NC0388 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,091 $100 Implemented
NC0388 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,810 $0 Implemented
NC0388 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $99 $150 Implemented
NC0388 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $995 $160 Implemented
NC0388 # 07 Y:2009 07 2009 DEVELOP A REPAIR/REPLACE POLICY $5,653 $8,935 Implemented
UM0352 # 01 Y:2009 01 2009 INSULATE FEEDWATER TANK $8,739 $3,454 Implemented
UM0352 # 02 Y:2009 02 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,001 $11,363 Not Implemented