IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0370 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,834 $1,980 Implemented
MI0370 # 09 Y:2020 09 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,780 $580 Implemented
MI0370 # 10 Y:2020 10 2020 INSTALL OCCUPANCY SENSORS $1,149 $500 Not Implemented
MI0370 # 11 Y:2020 11 2020 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $796 $134 Not Implemented
MZ0275 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $12,533 $24,500 Not Implemented
MZ0275 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $7,081 Not Implemented
MZ0275 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $5,169 $10,500 Not Implemented
MZ0275 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,201 $3,250 Not Implemented
MZ0275 # 05 Y:2020 05 2020 USE PHOTOCELL CONTROLS $1,385 $1,440 Not Implemented
MZ0275 # 06 Y:2020 06 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,072 $2,400 Not Implemented
UU0163 # 01 Y:2020 01 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $38,699 $100,000 Not Implemented
UU0163 # 02 Y:2020 02 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,850 $1,200 Not Implemented
UU0163 # 03 Y:2020 03 2020 ADOPT IN-HOUSE MATERIAL GENERATION $11,324 $5,000 Implemented
UU0163 # 04 Y:2020 04 2020 OPTIMIZE PLANT POWER FACTOR $4,707 $8,012 Not Implemented
UU0163 # 05 Y:2020 05 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,576 $2,000 Implemented
UU0163 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,414 $15,055 Implemented
UU0163 # 07 Y:2020 07 2020 ADOPT IN-HOUSE MATERIAL GENERATION $10,477 $5,000 Implemented
IC0236 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,924 $30,183 Implemented
IC0236 # 02 Y:2020 02 2020 BURN WOOD BY-PRODUCTS FOR HEAT $42,806 $9,522 Not Implemented
IC0236 # 03 Y:2020 03 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,481 $0 Implemented
IC0236 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $7,794 $18,280 Not Implemented
IC0236 # 05 Y:2020 05 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $77,665 $110,000 Not Implemented
IC0236 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,626 $4,075 Implemented
IC0236 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,304 $100 Not Implemented
UF0549 # 01 Y:2020 01 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $737,260 $2,600,000 Not Implemented