Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0370 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,834 | $1,980 | Implemented |
MI0370 # 09 Y:2020 | 09 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,780 | $580 | Implemented |
MI0370 # 10 Y:2020 | 10 | 2020 | INSTALL OCCUPANCY SENSORS | $1,149 | $500 | Not Implemented |
MI0370 # 11 Y:2020 | 11 | 2020 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $796 | $134 | Not Implemented |
MZ0275 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,533 | $24,500 | Not Implemented |
MZ0275 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,790 | $7,081 | Not Implemented |
MZ0275 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $5,169 | $10,500 | Not Implemented |
MZ0275 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,201 | $3,250 | Not Implemented |
MZ0275 # 05 Y:2020 | 05 | 2020 | USE PHOTOCELL CONTROLS | $1,385 | $1,440 | Not Implemented |
MZ0275 # 06 Y:2020 | 06 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,072 | $2,400 | Not Implemented |
UU0163 # 01 Y:2020 | 01 | 2020 | USE EXISTING DAM TO GENERATE ELECTRICITY | $38,699 | $100,000 | Not Implemented |
UU0163 # 02 Y:2020 | 02 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $29,850 | $1,200 | Not Implemented |
UU0163 # 03 Y:2020 | 03 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $11,324 | $5,000 | Implemented |
UU0163 # 04 Y:2020 | 04 | 2020 | OPTIMIZE PLANT POWER FACTOR | $4,707 | $8,012 | Not Implemented |
UU0163 # 05 Y:2020 | 05 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,576 | $2,000 | Implemented |
UU0163 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,414 | $15,055 | Implemented |
UU0163 # 07 Y:2020 | 07 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $10,477 | $5,000 | Implemented |
IC0236 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,924 | $30,183 | Implemented |
IC0236 # 02 Y:2020 | 02 | 2020 | BURN WOOD BY-PRODUCTS FOR HEAT | $42,806 | $9,522 | Not Implemented |
IC0236 # 03 Y:2020 | 03 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $15,481 | $0 | Implemented |
IC0236 # 04 Y:2020 | 04 | 2020 | USE RADIANT HEATER FOR SPOT HEATING | $7,794 | $18,280 | Not Implemented |
IC0236 # 05 Y:2020 | 05 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $77,665 | $110,000 | Not Implemented |
IC0236 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,626 | $4,075 | Implemented |
IC0236 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,304 | $100 | Not Implemented |
UF0549 # 01 Y:2020 | 01 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $737,260 | $2,600,000 | Not Implemented |