IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0641 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,929 $16,830 Not Implemented
SD0641 # 05 Y:2023 05 2023 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,325 $8,632 Not Implemented
SD0641 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $252 $1,171 Not Implemented
SD0641 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $46,189 $70,634 Implemented
SD0641 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $628 $1,441 Not Implemented
SD0641 # 09 Y:2023 09 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $3,019 $7,800 Not Implemented
SD0641 # 10 Y:2023 10 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,049 $6,650 Not Implemented
SD0641 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $347 $332 Not Implemented
SD0641 # 12 Y:2023 12 2023 USE MORE EFFICIENT ADHESIVE APPLICATORS $80,045 $6,600 Not Implemented
SF0605 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $24,945 $4,958 Implemented
SF0605 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $848 $420 Not Implemented
SF0605 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,696 $38,888 Not Implemented
SF0605 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $2,116 $10,832 Implemented
SF0605 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $233 $1,287 Implemented
SF0605 # 06 Y:2023 06 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $21,756 $37,440 Not Implemented
SF0605 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $129,996 $428,510 Not Implemented
WV0649 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $19,114 $9,160 Implemented
WV0649 # 02 Y:2023 02 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,485 $18,440 Not Implemented
WV0649 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $10,514 $13,660 Not Implemented
WV0649 # 04 Y:2023 04 2023 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $10,248 $20,166 Not Implemented
WV0649 # 05 Y:2023 05 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,620 $1,500 Implemented
WV0649 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,203 $4,464 Not Implemented
WV0649 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,255 $3,000 Implemented
WV0649 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $6,156 $1,439 Implemented
WV0649 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,697 $13,390 Implemented