Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,302
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0345 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $330 | $300 | Implemented |
BD0345 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,343 | $1,000 | Implemented |
BD0345 # 06 Y:2008 | 06 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $3,422 | $10,592 | Implemented |
BD0345 # 07 Y:2008 | 07 | 2008 | USE SYNTHETIC LUBRICANT | $72 | $100 | Implemented |
SF0356 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,321 | $150 | Not Implemented |
SF0356 # 02 Y:2008 | 02 | 2008 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $41,503 | $0 | Not Implemented |
SF0356 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,655 | $6,281 | Implemented |
SF0356 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $2,504 | $3,760 | Not Implemented |
SF0356 # 05 Y:2008 | 05 | 2008 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $17,740 | $26,898 | Implemented |
SF0356 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,472 | $80,535 | Implemented |
SF0356 # 07 Y:2008 | 07 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,534 | $10,979 | Not Implemented |
SF0356 # 08 Y:2008 | 08 | 2008 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,532 | $4,549 | Not Implemented |
SF0356 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,225 | $40,545 | Implemented |
SF0356 # 10 Y:2008 | 10 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,810 | $36,311 | Not Implemented |
LE0269 # 01 Y:2008 | 01 | 2008 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $112,626 | $500,000 | Implemented |
LE0269 # 02 Y:2008 | 02 | 2008 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $77,672 | $600,000 | Implemented |
LE0269 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $27,087 | $9,000 | Not Implemented |
LE0269 # 04 Y:2008 | 04 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $14,712 | $250 | Implemented |
LE0269 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,284 | $3,500 | Implemented |
LE0269 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $6,589 | $720 | Not Implemented |
LE0269 # 07 Y:2008 | 07 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,734 | $3,000 | Not Implemented |
LE0269 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,038 | $900 | Implemented |
LE0269 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,596 | $36,313 | Not Implemented |
LL0292 # 01 Y:2008 | 01 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $28,398 | $5,196 | Not Implemented |
LL0292 # 02 Y:2008 | 02 | 2008 | AIR CONDITION ONLY SPACE NECESSARY | $16,129 | $0 | Implemented |