IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0244 # 07 Y:2013 07 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,411 $80 Implemented
MI0244 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,368 $2,340 Not Implemented
MI0244 # 09 Y:2013 09 2013 INSTALL OCCUPANCY SENSORS $2,117 $446 Implemented
MI0244 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,192 $1,660 Implemented
UM0425 # 01 Y:2013 01 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,900 $13,000 Not Implemented
UM0425 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,480 $3,300 Implemented
UM0425 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,115 $0 Implemented
UM0425 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,752 $5,000 Implemented
UM0425 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $695 $308 Implemented
MA0710 # 01 Y:2013 01 2013 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $132,553 $324,000 Not Implemented
MA0710 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,966 $10,580 Implemented
MA0710 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,915 $10,580 Implemented
MA0710 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,884 $7,500 Not Implemented
MA0710 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,460 $6,400 Not Implemented
MA0710 # 06 Y:2013 06 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $3,796 $1,000 Not Implemented
MA0710 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,115 $2,705 Implemented
OK0856 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $1,284 $1,725 Not Implemented
OK0856 # 02 Y:2013 02 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,800 $11,700 Not Implemented
OK0856 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $750 Implemented
OK0856 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,300 $550 Not Implemented
IP0015 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,644 $0 Implemented
IP0015 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,757 $0 Not Implemented
IP0015 # 03 Y:2013 03 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $730 $0 Not Implemented
IP0015 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,044 $118 Not Implemented
IP0015 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,010 $1,400 Implemented