Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0328 # 10 Y:2018 | 10 | 2018 | USE PHOTOCELL CONTROLS | $1,016 | $2,773 | Implemented |
MI0328 # 11 Y:2018 | 11 | 2018 | INSULATE BARE EQUIPMENT | $1,011 | $206 | Not Implemented |
AM0748 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $14,240 | $17,670 | Not Implemented |
AM0748 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,300 | $51,700 | Implemented |
AM0748 # 03 Y:2018 | 03 | 2018 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $13,900 | $18,200 | Implemented |
AM0748 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,425 | $1,000 | Implemented |
AM0748 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,640 | $0 | Implemented |
AM0748 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,020 | $345 | Implemented |
AM0748 # 07 Y:2018 | 07 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,160 | $145 | Implemented |
UK1802 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $35,828 | $14,140 | Not Implemented |
UK1802 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,526 | $19,379 | Not Implemented |
UK1802 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,079 | $2,780 | Not Implemented |
UK1802 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,905 | $1,700 | Not Implemented |
UK1802 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,533 | $0 | Not Implemented |
UK1802 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,227 | $507 | Not Implemented |
UK1802 # 07 Y:2018 | 07 | 2018 | USE ONLY CERTIFIED MOTOR REPAIR SHOPS | $3,271 | $679 | Not Implemented |
UK1802 # 08 Y:2018 | 08 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,127 | $0 | Not Implemented |
UK1802 # 09 Y:2018 | 09 | 2018 | INSULATE BARE EQUIPMENT | $439 | $224 | Not Implemented |
UK1802 # 10 Y:2018 | 10 | 2018 | USE MINIMUM STEAM OPERATING PRESSURE | $372 | $0 | Not Implemented |
UK1802 # 11 Y:2018 | 11 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $42,791 | $10,639 | Not Implemented |
LE0452 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,430 | $1,000 | Not Implemented |
LE0452 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,260 | $600 | Not Implemented |
LE0452 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,616 | $17,500 | Not Implemented |
LE0452 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,984 | $45,750 | Not Implemented |
LE0452 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $40,671 | $115,000 | Not Implemented |