IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0317 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,617 $13,469 Implemented
LE0317 # 04 Y:2011 04 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $28,496 $10,000 Not Implemented
LE0317 # 05 Y:2011 05 2011 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,299 $75,000 Not Implemented
LE0317 # 06 Y:2011 06 2011 REPAIR OR REPLACE STEAM TRAPS $23,321 $4,200 Implemented
LE0317 # 07 Y:2011 07 2011 RECOVER WASTE HEAT FROM EQUIPMENT $12,721 $22,000 Implemented
LE0317 # 08 Y:2011 08 2011 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $11,375 $100,000 Implemented
LE0317 # 09 Y:2011 09 2011 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,387 $8,000 Implemented
LE0317 # 10 Y:2011 10 2011 RECOVER WASTE HEAT FROM EQUIPMENT $8,358 $870 Implemented
LE0317 # 11 Y:2011 11 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,938 $3,000 Implemented
LE0317 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,001 $4,500 Not Implemented
LE0317 # 13 Y:2011 13 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,553 $2,440 Implemented
LE0317 # 14 Y:2011 14 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,029 $20,000 Not Implemented
LE0317 # 15 Y:2011 15 2011 INSTALL OCCUPANCY SENSORS $1,097 $2,035 Implemented
LE0317 # 16 Y:2011 16 2011 INSTALL OCCUPANCY SENSORS $153 $1,000 Implemented
LE0316 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,608 $67,275 Not Implemented
LE0316 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,225 $11,500 Not Implemented
LE0316 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,035 $13,000 Not Implemented
LE0316 # 04 Y:2011 04 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,994 $3,000 Not Implemented
LE0316 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,230 $25,000 Not Implemented
LE0316 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $2,639 $2,250 Not Implemented
LE0316 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,209 $3,200 Not Implemented
LE0316 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,621 $1,120 Not Implemented
LE0316 # 09 Y:2011 09 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,438 $23,800 Not Implemented
LE0316 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,860 $3,600 Not Implemented
LE0316 # 11 Y:2011 11 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,567 $3,205 Not Implemented