IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0700 # 15 Y:2004 15 2004 INSULATE BARE EQUIPMENT $604 $1,575 Not Implemented
UD0700 # 16 Y:2004 16 2004 UPGRADE CONTROLS ON COMPRESSORS $588 $500 Implemented
UD0700 # 01 Y:2004 01 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $454,279 $226,320 Not Implemented
UD0700 # 02 Y:2004 02 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $256,000 $538,944 Not Implemented
UD0700 # 03 Y:2004 03 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $35,000 $0 Not Implemented
UD0700 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,353 $82,536 Implemented
UD0700 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,176 $1,380 Not Implemented
UD0700 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,941 $0 Not Implemented
UD0700 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,656 $3,000 Not Implemented
UD0700 # 08 Y:2004 08 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,312 $8,302 Not Implemented
UD0700 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,471 $4,116 Not Implemented
UD0700 # 10 Y:2004 10 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,258 $1,405 Not Implemented
UF0349 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,789 $10,863 Not Implemented
UF0349 # 02 Y:2004 02 2004 ADD AREA LIGHTING SWITCHES $1,188 $6,111 Not Implemented
UF0349 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,231 $4,583 Not Implemented
UF0349 # 04 Y:2004 04 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,922 $9,158 Not Implemented
UM0263 # 01 Y:2004 01 2004 EXPAND OPERATIONS INTO UNUSED SPACE $72,800 $11,600 Not Implemented
UM0263 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,652 $1,350 Not Implemented
UM0263 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,527 $16,352 Not Implemented
UM0263 # 04 Y:2004 04 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,280 $9,583 Not Implemented
UM0263 # 05 Y:2004 05 2004 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $4,026 $11,000 Not Implemented
UM0263 # 06 Y:2004 06 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,663 $50 Not Implemented
UM0263 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,670 $500 Not Implemented
UM0263 # 08 Y:2004 08 2004 COVER OPEN TANKS $912 $100 Not Implemented
UM0263 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $880 $3,280 Not Implemented