IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0292 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,271 $1,520 Implemented
LL0292 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,715 $0 Implemented
LL0292 # 05 Y:2008 05 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $3,578 $3,988 Not Implemented
LL0292 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $30 Implemented
LL0292 # 07 Y:2008 07 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,599 $792 Implemented
LL0292 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $238 $180 Implemented
LL0292 # 09 Y:2008 09 2008 INSULATE BARE EQUIPMENT $80 $242 Implemented
MA0638 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $43,903 $225,000 Not Implemented
MA0638 # 02 Y:2008 02 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,075 $56,000 Not Implemented
MA0638 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $12,360 $2,500 Implemented
MA0638 # 04 Y:2008 04 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $6,135 $20,000 Not Implemented
MA0638 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,325 $8,800 Not Implemented
MA0638 # 06 Y:2008 06 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,428 $16,500 Not Implemented
MA0638 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $0 Implemented
MA0638 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,670 $3,000 Implemented
MA0638 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,488 $2,450 Not Implemented
MA0638 # 10 Y:2008 10 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,230 $2,000 Implemented
GT0849 # 01 Y:2008 01 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $98,980 $0 Not Implemented
GT0849 # 02 Y:2008 02 2008 BURN WOOD BY-PRODUCTS FOR HEAT $175,600 $100,000 Not Implemented
GT0849 # 03 Y:2008 03 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $57,260 $0 Not Implemented
GT0849 # 04 Y:2008 04 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $292,310 $18,200 Implemented
GT0849 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $35,083 $40,800 Not Implemented
GT0849 # 06 Y:2008 06 2008 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $228,740 $900,000 Not Implemented
UA0020 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,259 $60,237 Implemented
UA0020 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,022 $15,096 Implemented