IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,642

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0347 # 08 Y:2004 08 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $29,440 $50,000 Not Implemented
IA0347 # 09 Y:2004 09 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $244 $0 Implemented
BD0266 # 01 Y:2004 01 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $260 $11,000 Implemented
BD0266 # 02 Y:2004 02 2004 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $6,225 $4,930 Implemented
BD0266 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,992 $600 Implemented
BD0266 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,081 $2,765 Implemented
BD0266 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $703 $1,425 Implemented
BD0266 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $504 $220 Implemented
BD0266 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $323 Implemented
BD0266 # 08 Y:2004 08 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $329 $510 Implemented
BD0266 # 09 Y:2004 09 2004 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $2,462 $1,575 Not Implemented
BD0266 # 10 Y:2004 10 2004 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,020 $96 Implemented
BD0266 # 11 Y:2004 11 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,200 $96 Implemented
BD0266 # 12 Y:2004 12 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,404 $2,500 Implemented
BD0258 # 01 Y:2004 01 2004 INSTALL OCCUPANCY SENSORS $2,506 $2,025 Implemented
BD0258 # 02 Y:2004 02 2004 INSTALL OCCUPANCY SENSORS $953 $2,175 Implemented
BD0258 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $952 $1,280 Implemented
BD0258 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $611 $600 Implemented
BD0258 # 05 Y:2004 05 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $575 $24 Not Implemented
BD0258 # 06 Y:2004 06 2004 INSTALL SPECTRAL REFLECTORS / DELAMP $271 $335 Implemented
BD0258 # 07 Y:2004 07 2004 USE LESS WASTEFUL PACKAGING $1,672 $180 Not Implemented
BD0242 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,744 $17,700 n/a
BD0242 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,232 $900 Implemented
BD0242 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,183 $11,800 Implemented
BD0242 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,274 $500 Implemented