IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,776

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0691 # 02 Y:2000 02 2000 DEVELOP A REPAIR/REPLACE POLICY $110,155 $5,075 Not Implemented
TN0691 # 03 Y:2000 03 2000 MODIFY CURRENT INCENTIVE PROGRAM $85,000 $16,580 Not Implemented
TN0691 # 04 Y:2000 04 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,545 $18,900 Not Implemented
TN0691 # 05 Y:2000 05 2000 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $11,700 $35,640 Not Implemented
TN0691 # 06 Y:2000 06 2000 RECOVER AND REUSE WASTE MATERIAL $10,100 $0 Not Implemented
TN0691 # 07 Y:2000 07 2000 INSTALL SKYLIGHTS $2,160 $9,680 Not Implemented
TN0691 # 08 Y:2000 08 2000 USE RE-USABLE FILTERS $640 $0 Implemented
TN0689 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $97,005 $100,000 Implemented
TN0689 # 02 Y:2000 02 2000 ELIMINATE/REDUCE AN OPERATION $35,890 $108,460 Not Implemented
TN0689 # 03 Y:2000 03 2000 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,180 $18,900 Not Implemented
TN0689 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,245 $5,625 Implemented
TN0689 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,460 $19,500 Not Implemented
TN0689 # 06 Y:2000 06 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,220 $0 Not Implemented
TN0689 # 07 Y:2000 07 2000 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $4,345 $300 Implemented
TN0689 # 08 Y:2000 08 2000 ADD AREA LIGHTING SWITCHES $3,620 $6,160 Implemented
TN0689 # 09 Y:2000 09 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $540 $0 Not Implemented
TN0688 # 01 Y:2000 01 2000 RECOVER AND REUSE WASTE MATERIAL $34,250 $131,500 Not Implemented
TN0688 # 02 Y:2000 02 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $211,827 $100,400 Implemented
TN0688 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $29,380 $27,925 Not Implemented
TN0688 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $23,435 $12,800 Not Implemented
TN0688 # 05 Y:2000 05 2000 REDUCE SCRAP PRODUCTION $29,580 $0 Not Implemented
TN0688 # 06 Y:2000 06 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $20,548 $1,075 Not Implemented
TN0688 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,871 $0 Not Implemented
TN0688 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $1,965 $735 Not Implemented
TN0688 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,290 $0 Implemented