IAC Assessment: MS0269
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0269
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 2005
Principal Product printers
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 650,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $273,824 7,180,000 kWh $0.04
Electricity Demand $167,194 15,094 kW-months/year $11.08
Electricity Fees $30,871 - $ -
Natural Gas $7,506 617 MMBtu $12.17
TOTAL ENERGY COSTS $479,941
RECOMMENDED SAVINGS* $332,424 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $331,929
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$126,283
Cost:
$13,608
$118,022 3,109,930 - - $8,261 - $118,022
3,109,930
kWh
-
-
kW-months/year
$8,261
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$61,735
Cost:
$79,029
$40,520 1,067,726 $17,176 1,463 $4,039 - $40,520
1,067,726
kWh
$17,176
1,463
kW-months/year
$4,039
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$61,542
Cost:
$1,920
$40,399 1,064,540 $17,117 1,458 $4,026 - $40,399
1,064,540
kWh
$17,117
1,458
kW-months/year
$4,026
-
$
04: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$38,704
Cost:
$8,800
$36,172 953,148 - - $2,532 - $36,172
953,148
kWh
-
-
kW-months/year
$2,532
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$24,256
Cost:
$50
- - - - $24,256 - -
-
kWh
-
-
kW-months/year
$24,256
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$11,055
Cost:
-
$10,332 272,256 - - $723 - $10,332
272,256
kWh
-
-
kW-months/year
$723
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$8,354
Cost:
-
- - $7,807 665 $547 - -
-
kWh
$7,807
665
kW-months/year
$547
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$495
Cost:
$180
$463 12,200 - - $32 - $463
12,200
kWh
-
-
kW-months/year
$32
-
$
TOTAL RECOMMENDED Savings:
$332,424
Cost:
$103,587
$245,908 6,479,800 $42,100 3,586 $44,416 - $245,908
6,479,800
kWh
$42,100
3,586
kW-months/year
$44,416
-
$
TOTAL IMPLEMENTED Savings:
$331,929
Cost:
$103,407
$245,445 6,467,600 $42,100 3,586 $44,384 - $245,445
6,467,600
kWh
$42,100
3,586
kW-months/year
$44,384
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees