IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0299 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,496 $8,700 Implemented
UM0299 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,108 $9,353 Implemented
UM0299 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,706 $738 Implemented
UM0299 # 05 Y:2006 05 2006 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,156 $25 Implemented
UM0299 # 06 Y:2006 06 2006 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,389 $2,750 Not Implemented
UM0299 # 07 Y:2006 07 2006 INSTALL SKYLIGHTS $208 $184 Implemented
GT0819 # 01 Y:2006 01 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $140,000 $10,000 Implemented
GT0819 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,030 $4,800 Implemented
GT0819 # 03 Y:2006 03 2006 UPGRADE CONTROLS ON COMPRESSORS $18,798 $5,000 Implemented
GT0819 # 04 Y:2006 04 2006 DISCONNECT BALLASTS $2,735 $3,678 Implemented
GT0819 # 05 Y:2006 05 2006 USE EXISTING DAM TO GENERATE ELECTRICITY $106,850 $94,000 Implemented
GT0819 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $82,242 $108,000 Not Implemented
GT0819 # 07 Y:2006 07 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $298,817 $375,000 Not Implemented
GT0819 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,620 $114,950 Not Implemented
GT0819 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,054 $214,725 Not Implemented
WI0517 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,918 $6,000 Not Implemented
WI0517 # 02 Y:2006 02 2006 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $25,159 $4,500 Not Implemented
WI0517 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,406 $37,744 Implemented
WI0517 # 04 Y:2006 04 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,970 $14,000 Not Implemented
WI0517 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,306 $500 Implemented
WI0517 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,872 $2,000 Not Implemented
WI0517 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,730 $5,500 Not Implemented
LL0253 # 01 Y:2006 01 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $4,994,000 $250,000 Not Implemented
LL0253 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $658,473 $14,120 Implemented
LL0253 # 03 Y:2006 03 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $177,541 $24,000 Not Implemented