Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0299 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,496 | $8,700 | Implemented |
UM0299 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,108 | $9,353 | Implemented |
UM0299 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,706 | $738 | Implemented |
UM0299 # 05 Y:2006 | 05 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,156 | $25 | Implemented |
UM0299 # 06 Y:2006 | 06 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,389 | $2,750 | Not Implemented |
UM0299 # 07 Y:2006 | 07 | 2006 | INSTALL SKYLIGHTS | $208 | $184 | Implemented |
GT0819 # 01 Y:2006 | 01 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $140,000 | $10,000 | Implemented |
GT0819 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,030 | $4,800 | Implemented |
GT0819 # 03 Y:2006 | 03 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $18,798 | $5,000 | Implemented |
GT0819 # 04 Y:2006 | 04 | 2006 | DISCONNECT BALLASTS | $2,735 | $3,678 | Implemented |
GT0819 # 05 Y:2006 | 05 | 2006 | USE EXISTING DAM TO GENERATE ELECTRICITY | $106,850 | $94,000 | Implemented |
GT0819 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $82,242 | $108,000 | Not Implemented |
GT0819 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $298,817 | $375,000 | Not Implemented |
GT0819 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,620 | $114,950 | Not Implemented |
GT0819 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57,054 | $214,725 | Not Implemented |
WI0517 # 01 Y:2006 | 01 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $27,918 | $6,000 | Not Implemented |
WI0517 # 02 Y:2006 | 02 | 2006 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $25,159 | $4,500 | Not Implemented |
WI0517 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,406 | $37,744 | Implemented |
WI0517 # 04 Y:2006 | 04 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $9,970 | $14,000 | Not Implemented |
WI0517 # 05 Y:2006 | 05 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,306 | $500 | Implemented |
WI0517 # 06 Y:2006 | 06 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,872 | $2,000 | Not Implemented |
WI0517 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,730 | $5,500 | Not Implemented |
LL0253 # 01 Y:2006 | 01 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $4,994,000 | $250,000 | Not Implemented |
LL0253 # 02 Y:2006 | 02 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $658,473 | $14,120 | Implemented |
LL0253 # 03 Y:2006 | 03 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $177,541 | $24,000 | Not Implemented |