IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0613 # 01 Y:2012 01 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,010 $38,103 Implemented
AM0613 # 02 Y:2012 02 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $16,300 $20,900 Implemented
AM0613 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $14,800 $2,230 Not Implemented
AM0613 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,265 $600 Implemented
AM0613 # 05 Y:2012 05 2012 USE PHOTOCELL CONTROLS $3,000 $1,000 Implemented
AM0613 # 06 Y:2012 06 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $694 $108 Implemented
AM0613 # 07 Y:2012 07 2012 USE PHOTOCELL CONTROLS $49 $100 Implemented
TT0091 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,974 $3,000 Implemented
TT0091 # 02 Y:2012 02 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $170 $20 Not Implemented
TT0091 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $688 $350 Implemented
TT0091 # 04 Y:2012 04 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $3,203 $0 Implemented
UA0083 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,259 $39,310 Implemented
UA0083 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $3,058 $2,513 Not Implemented
UA0083 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,034 $480 Not Implemented
UA0083 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $806 $480 Not Implemented
UA0083 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $244 $634 Not Implemented
UA0083 # 06 Y:2012 06 2012 USE RADIANT HEATER FOR SPOT HEATING $1,585 $3,212 Not Implemented
UA0083 # 07 Y:2012 07 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,356 $2,344 Not Implemented
UA0083 # 08 Y:2012 08 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $702 $386 Not Implemented
WV0450 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $173,557 $1,000 Implemented
WV0450 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $141,590 $210,000 Not Implemented
WV0450 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $130,899 $157,320 Implemented
WV0450 # 04 Y:2012 04 2012 REDESIGN PROCESS $102,043 $230,000 Not Implemented
WV0450 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $97,121 $400,000 Not Implemented
WV0450 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,667 $21,800 Not Implemented