IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0506 # 07 Y:2017 07 2017 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $60,000 $55,338 Not Implemented
AS0440 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,622 $15,120 Not Implemented
AS0440 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $315 $500 Not Implemented
AS0440 # 03 Y:2017 03 2017 USE GRAVITY FEEDS WHEREVER POSSIBLE $8,594 $13,600 Not Implemented
AS0440 # 04 Y:2017 04 2017 REDUCE FLUID FLOW RATES $892 $920 Not Implemented
AS0440 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,136 $100 Not Implemented
GT0898 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,203 $150 Not Implemented
GT0898 # 02 Y:2017 02 2017 METER WASTE WATER $38,607 $18,000 Implemented
GT0898 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,648 $9,390 Implemented
GT0898 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,223 $8,011 Not Implemented
GT0898 # 05 Y:2017 05 2017 USE SOLAR HEAT FOR HEAT $42,901 $150,153 Not Implemented
UM0488 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,972 $3,000 n/a
UM0488 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,383 $300 n/a
UM0488 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $931 $1,500 n/a
UM0488 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,992 $8,978 n/a
UM0488 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $1,958 $2,400 n/a
SD0550 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $526,998 $1,348,560 Not Implemented
SD0550 # 02 Y:2017 02 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $119,615 $210,000 Implemented
SD0550 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,225 $2,500 Implemented
SD0550 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,945 $600 Not Implemented
SD0550 # 05 Y:2017 05 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,077 $9,750 Not Implemented
UK1615 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $84,940 $369,150 Not Implemented
UK1615 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,144 $0 Implemented
UK1615 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $4,290 Implemented
UK1615 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,711 $3,465 Implemented