Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0862 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $4,461 | $14,400 | n/a |
MA0862 # 06 Y:2023 | 06 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,059 | $800 | n/a |
MA0862 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,570 | $2,160 | n/a |
AS0555 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,191 | $11,546 | Not Implemented |
AS0555 # 02 Y:2023 | 02 | 2023 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $10,191 | $10,364 | Not Implemented |
AS0555 # 03 Y:2023 | 03 | 2023 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $3,260 | $2,932 | Not Implemented |
AS0555 # 04 Y:2023 | 04 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,107 | $1,243 | Not Implemented |
AS0555 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,534 | $2,105 | Not Implemented |
AS0555 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,078 | $399 | Not Implemented |
AS0555 # 07 Y:2023 | 07 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $871 | $21 | Not Implemented |
AS0556 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,360 | $14,735 | Not Implemented |
AS0556 # 02 Y:2023 | 02 | 2023 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $35,924 | $12,039 | Not Implemented |
AS0556 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,073 | $10,283 | Not Implemented |
AS0556 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,579 | $2,858 | Not Implemented |
AS0556 # 05 Y:2023 | 05 | 2023 | USE PHOTOCELL CONTROLS | $4,658 | $7,034 | Not Implemented |
AS0556 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $703 | $532 | Not Implemented |
NT0013 # 01 Y:2023 | 01 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $71,747 | $106,919 | Implemented |
NT0013 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,755 | $21,512 | Implemented |
NT0013 # 03 Y:2023 | 03 | 2023 | OPTIMIZE PLANT POWER FACTOR | $10,076 | $5,043 | Not Implemented |
NT0013 # 04 Y:2023 | 04 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $49,000 | $83,421 | Implemented |
NT0013 # 05 Y:2023 | 05 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $17,430 | $54,000 | Implemented |
NT0013 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,102 | $0 | Implemented |
NT0013 # 07 Y:2023 | 07 | 2023 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $720,000 | $120,000 | Implemented |
NL0080 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,794 | $120 | Implemented |
NL0080 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,690 | $38,085 | Not Implemented |