Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,616
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0229 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $987 | $196 | Not Implemented |
MS0229 # 05 Y:2003 | 05 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $967 | $67 | Not Implemented |
MS0229 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $434 | $472 | Not Implemented |
MS0229 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $61 | $140 | Not Implemented |
GT0759 # 01 Y:2003 | 01 | 2003 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $5,870 | $3,000 | Implemented |
GT0759 # 02 Y:2003 | 02 | 2003 | INSULATE BARE EQUIPMENT | $770,950 | $340,200 | Not Implemented |
GT0759 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,765 | $188,200 | Implemented |
GT0759 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $200,910 | $20,900 | n/a |
GT0759 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $157,690 | $210,000 | n/a |
GT0759 # 06 Y:2003 | 06 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $287,380 | $24,500 | n/a |
GT0759 # 07 Y:2003 | 07 | 2003 | USE RADIANT HEATER FOR SPOT HEATING | $5,960 | $2,190 | Implemented |
GT0759 # 08 Y:2003 | 08 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $89,620 | $108,930 | Implemented |
GT0743 # 01 Y:2002 | 01 | 2002 | USE MINIMUM STEAM OPERATING PRESSURE | $1,259 | $0 | Implemented |
GT0743 # 02 Y:2002 | 02 | 2002 | OPERATE BOILERS ON HIGH FIRE SETTING | $5,598 | $0 | Not Implemented |
GT0743 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $671 | $0 | Not Implemented |
GT0743 # 04 Y:2002 | 04 | 2002 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $10,781 | $1,720 | Implemented |
GT0743 # 05 Y:2002 | 05 | 2002 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $78,433 | $112,650 | Not Implemented |
GT0743 # 06 Y:2002 | 06 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,792 | $5,050 | Not Implemented |
GT0743 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,206 | $17,240 | Not Implemented |
GT0743 # 08 Y:2002 | 08 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,666 | $0 | Not Implemented |
GT0733 # 01 Y:2002 | 01 | 2002 | COMBINE UTILITY METERS | $13,100 | $1,000 | Not Implemented |
GT0733 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,343 | $49,000 | Not Implemented |
GT0733 # 03 Y:2002 | 03 | 2002 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $56,762 | $237,300 | Not Implemented |
GT0733 # 04 Y:2002 | 04 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $22,495 | $2,500 | Not Implemented |
GT0733 # 05 Y:2002 | 05 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,965 | $14,670 | Not Implemented |