IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0262 # 01 Y:2004 01 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,974 $1,200 Not Implemented
UM0262 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,373 $300 Not Implemented
UM0262 # 03 Y:2004 03 2004 AIR CONDITION ONLY SPACE NECESSARY $2,293 $1,410 Not Implemented
UM0262 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,197 $500 Not Implemented
UM0262 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,427 $1,910 Not Implemented
UM0262 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $1,248 Implemented
UM0262 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $4,751 $27,856 Not Implemented
UM0262 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $639 $1,000 Not Implemented
MI0087 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,721 $590 Not Implemented
MI0087 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,417 $223 Not Implemented
MI0087 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,760 $300 Not Implemented
MI0087 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,320 $14,068 Not Implemented
MI0087 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,075 $40 Not Implemented
LM0081 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,802 $0 Not Implemented
LM0081 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,857 $300 Implemented
LM0081 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $85 $0 Not Implemented
LM0081 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $160 $80 Not Implemented
LM0081 # 05 Y:2004 05 2004 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $233,065 $1,000 Not Implemented
LM0081 # 06 Y:2004 06 2004 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $292,248 $4,925 Not Implemented
LM0081 # 07 Y:2004 07 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,611 $1,814 Not Implemented
SD0346 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,785 $320 Implemented
SD0346 # 02 Y:2004 02 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,306 $9,465 Implemented
SD0346 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,189 $413 Not Implemented
SD0346 # 04 Y:2004 04 2004 INSTALL SKYLIGHTS $8,771 $21,250 Not Implemented
SD0346 # 05 Y:2004 05 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $128,000 $115,000 Not Implemented