Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,304
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0367 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,497 | $200 | Not Implemented |
UM0367 # 06 Y:2010 | 06 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $27,997 | $68,395 | Implemented |
UM0367 # 07 Y:2010 | 07 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $17,317 | $9,800 | Implemented |
UM0367 # 08 Y:2010 | 08 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,939 | $500 | Implemented |
UM0367 # 09 Y:2010 | 09 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,537 | $10,500 | Not Implemented |
UM0367 # 10 Y:2010 | 10 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $4,999 | $8,600 | Not Implemented |
UM0367 # 11 Y:2010 | 11 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,186 | $7,500 | Implemented |
UM0367 # 12 Y:2010 | 12 | 2010 | INSULATE BARE EQUIPMENT | $573 | $3,568 | Not Implemented |
UM0367 # 13 Y:2010 | 13 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $277 | $329 | Implemented |
UM0367 # 14 Y:2010 | 14 | 2010 | INSTALL STORM WINDOWS AND DOORS | $171 | $1,400 | Implemented |
SU0295 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,574 | $0 | Implemented |
SU0295 # 02 Y:2010 | 02 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,022 | $0 | Not Implemented |
SU0295 # 03 Y:2010 | 03 | 2010 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $595,177 | $272,656 | Implemented |
SU0295 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,178 | $1,225 | Implemented |
SU0295 # 05 Y:2010 | 05 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $29,403 | $27,649 | Implemented |
SU0295 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,800 | $1,649 | Not Implemented |
SU0295 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,943 | $74,298 | Implemented |
SU0295 # 08 Y:2010 | 08 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $90 | $724 | Not Implemented |
LL0328 # 01 Y:2010 | 01 | 2010 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $26,498 | $304 | Implemented |
LL0328 # 02 Y:2010 | 02 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $9,654 | $3,600 | Implemented |
LL0328 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,572 | $2,800 | Implemented |
LL0328 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,119 | $700 | Not Implemented |
LL0328 # 05 Y:2010 | 05 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $406 | $1,435 | Not Implemented |
LL0328 # 06 Y:2010 | 06 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $403 | $471 | Not Implemented |
BD0374 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,008 | $3,000 | Implemented |