IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0262 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $12,213 $400 Implemented
MI0262 # 03 Y:2014 03 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,987 $16,340 Not Implemented
MI0262 # 04 Y:2014 04 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,323 $3,240 Implemented
MI0262 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,253 $1,660 Implemented
MI0262 # 06 Y:2014 06 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,456 $9,180 Not Implemented
MI0262 # 07 Y:2014 07 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,255 $3,600 Not Implemented
MI0262 # 08 Y:2014 08 2014 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $4,075 $8,800 Not Implemented
MI0262 # 09 Y:2014 09 2014 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,426 $1,430 Implemented
MI0262 # 10 Y:2014 10 2014 PAY BILLS ON TIME TO AVOID LATE FEES $2,229 $240 Implemented
MI0262 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,311 $80 Implemented
WV0489 # 01 Y:2014 01 2014 COMBINE UTILITY METERS $19,660 $10,500 Not Implemented
WV0489 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,418 $17,825 Not Implemented
WV0489 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,336 $0 Implemented
WV0489 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,622 $6,539 Implemented
WV0489 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $4,585 $0 Implemented
WV0489 # 06 Y:2014 06 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,770 $1,000 Not Implemented
WV0489 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,213 $2,425 Implemented
WV0489 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,258 $271 Implemented
WV0489 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $965 $620 Not Implemented
WV0489 # 10 Y:2014 10 2014 INSTALL SET-BACK TIMERS $812 $1,375 Not Implemented
WV0489 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $564 $443 Not Implemented
IA0518 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,434 $704 Implemented
IA0518 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,232 $5,280 Implemented
IA0518 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $742 $1,050 Not Implemented
IA0518 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $939 $185 Implemented