IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0497 # 05 Y:2017 05 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $807 $1,047 Not Implemented
SF0497 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,760 $45,819 Not Implemented
SF0497 # 07 Y:2017 07 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $86,602 $530,610 Not Implemented
SF0496 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $852 $90 Not Implemented
SF0496 # 02 Y:2017 02 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,991 $546 Implemented
SF0496 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,454 $23,168 Implemented
SF0496 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $1,681 $3,001 Implemented
SF0496 # 05 Y:2017 05 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,437 $21,315 Not Implemented
SF0496 # 06 Y:2017 06 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,855 $20,327 Not Implemented
SF0496 # 07 Y:2017 07 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $169,204 $790,554 Not Implemented
SF0495 # 01 Y:2016 01 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,207 $661 Implemented
SF0495 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,370 $6,127 Implemented
SF0495 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,562 $3,136 Not Implemented
SF0495 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,447 $8,329 Implemented
SF0495 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $2,590 $6,532 Implemented
SF0495 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,109 $0 Not Implemented
SF0494 # 01 Y:2016 01 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,238 $0 Implemented
SF0494 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $270 $0 Implemented
SF0494 # 03 Y:2016 03 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $5,772 $2,510 Implemented
SF0494 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,469 $4,948 Implemented
SF0494 # 05 Y:2016 05 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,493 $5,050 Not Implemented
SF0494 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $567 $2,381 Implemented
SF0494 # 07 Y:2016 07 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $50,748 $406,834 Implemented
SF0493 # 01 Y:2016 01 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $81,971 $0 Implemented
SF0493 # 02 Y:2016 02 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,064 $1,350 Implemented