IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0304 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,590 $15,212 Implemented
KU0304 # 03 Y:1990 03 1990 OPTIMIZE PLANT POWER FACTOR $66,605 $54,000 Implemented
KU0304 # 04 Y:1990 04 1990 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $1,365 $200 Implemented
KU0304 # 05 Y:1990 05 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $35,795 $40,000 Not Implemented
KU0304 # 06 Y:1990 06 1990 INSTALL AUTOMATIC STACK DAMPER $1,690 $3,000 Implemented
KU0304 # 07 Y:1990 07 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $18,888 $13,080 Not Implemented
KU0304 # 08 Y:1990 08 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $76,000 $50,000 Implemented
KU0305 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $76,107 $149,700 Implemented
KU0305 # 02 Y:1990 02 1990 REDESIGN PROCESS $27,002 $15,000 Not Implemented
KU0305 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $13,188 $20,000 Not Implemented
KU0305 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,169 $13,750 Not Implemented
KU0305 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,945 $0 Implemented
KU0305 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $416 $750 Implemented
UD0308 # 01 Y:1990 01 1990 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $13,703 $1,500 Not Implemented
UD0308 # 02 Y:1990 02 1990 TREAT AND REUSE RINSE WATERS $5,588 $2,000 Not Implemented
UD0308 # 03 Y:1990 03 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,831 $0 Not Implemented
UD0308 # 04 Y:1990 04 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,904 $900 Not Implemented
UD0308 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $861 $1,050 Not Implemented
UD0309 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $13,076 $18,000 Not Implemented
UD0309 # 02 Y:1990 02 1990 INSTALL TIMERS AND/OR THERMOSTATS $3,951 $700 Implemented
UD0309 # 03 Y:1990 03 1990 AIR CONDITION ONLY SPACE NECESSARY $1,295 $200 Implemented
UD0309 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $3,374 $8,000 Not Implemented
UD0309 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $900 $500 Not Implemented
UD0309 # 06 Y:1990 06 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,028 $10,000 Implemented
UD0310 # 01 Y:1990 01 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,258 $0 Not Implemented